DescriptionGA Terminal
• Calculate the minimum terminal space required by
FAA for Dekalb County Airport . The existing GA
terminal has 1,200 SF of space and there are currently
4 design hour operations and 5 pilots/passengers per
design hour operation on average. What are the
expansion requirements in the years 2025, 2030 and
2040 given the following forecast:
• 2025 – 5 design hour operations
• 2030 – 6 design hour operations
• 2040 – 7 design hour operations
Assume the average number of pilots/passengers per design
hour operation remains the same in the future.
What are your recommendations?
GA Terminal – Assignment #5
Row
Description
1
Design Hour Operations
2
Design Hour Passengers
3
Planning Parameter (SF)
4
Space Required (SF)
5
Existing Capacity (SF)
6
Facility Requirement (SF)
(Shortfall)/Surplus
Existing
(2020)
2025
2030
2040
Based Aircraft Storage
• Based on the following forecast for based aircraft at
Dekalb County Airport calculate the requirements for
based aircraft storage.
• Assume that 70% of SE aircraft, 80% 0f ME aircraft and
100% for turbine aircraft require conventional storage
space.
• In addition, 15% of SE and 10% of ME aircraft require Thangars.
• The existing facilities at the airport consists of 20 T-hangar
units and 300,000 SF of conventional hangar storage
space.
• What are the based aircraft storage requirements in the
years 2025, 2030 and 2040?
Based Aircraft Storage – Assignment #5
Based Aircraft
SE Aircraft
ME Aircraft
Turbine Aircraft
Existing
100
40
10
2025
120
60
15
2030
140
80
25
2040
180
120
40
Based Aircraft Storage
Year
T-Hangar Requirements
SE (___% of Demand)
ME (___% of Demand)
Total Demand
Existing T-Hangars
(Shortfall)/Surplus
Existing
2025
2030
2040
Based Aircraft Storage
Year
Existing
Conventional Storage Requirements
SE (___% of Demand)
Planning Parameter
SE Space Required (SF)
ME (___% of Demand)
Planning Parameter
ME Space Required (SF)
Turbine (___% of Demand)
Planning Parameter
Turbine Space Required (SF)
Total Space Required (SF)
Existing Space (SF)
(Shortfall)/Surplus (SF)
2025
2030
2040
Based Aircraft Apron
• Based on the following forecast for based aircraft at
Dekalb County Airport calculate the requirements for
based aircraft tie-down space.
• Given: 70% of SE aircraft, 80% 0f ME aircraft and 100% for
turbine aircraft require conventional storage space.
• Given: 15% of SE and 10% of ME aircraft require Thangars.
• Given: the remainder of the based SE and ME aircraft
require tie-down storage.
• The existing facilities at the airport provide 8,000 SY of tiedown apron space.
• What are the based aircraft tie-down apron requirements
in the years 2025, 2030 and 2040?
Based Aircraft Storage – Assignment #5
Based Aircraft
SE Aircraft
ME Aircraft
Turbine Aircraft
Existing
100
40
10
2025
120
60
15
2030
140
80
25
2040
180
120
40
Based Aircraft Apron
Year
SE (___% of Demand)
ME (___% of Demand)
Total Demand
Planning Parameter (SY)
Total Tie-down Apron Area
Required (SY)
Existing Tie-down Apron (SY)
(Shortfall)/Surplus
Existing
2025
2030
2040
GA Vehicular Parking
• Calculate the vehicular parking space for Dekalb
County Airport . The existing GA terminal parking lot
has 11,200 SF of space and there are currently 4
design hour operations and 5 pilots/passengers per
design hour operation on average.
• What are the expansion requirements in the years
2015, 2020 and 2030 given the following forecast:
• 2025 – 5 design hour operations
• 2030 – 6 design hour operations
• 2040 – 7 design hour operations
Assume the average number of pilots/passengers per design
hour operation remains the same in the future.
GA Vehicular Parking – Assignment #5
Row
Description
1
Design Hour Operations
2
Design Hour Passengers
3
Number of spaces Required
4
Space Required (SF)
5
Existing Capacity (SF)
6
Facility Requirement (SF)
(Shortfall)/Surplus (Row 5Row 4)
Existing
(2020)
2025
2030
2040